Project Details

Address:

Duggan Street & Olive York Way, West Brunswick

Client:

R Corporation

Challenges:

The scale of the project meant the 315 apartments needed to be delivered over 4 separate stages, requiring strong management and programming from PPM. There was also a major constraint to the site being a 9m slope across the site, which would impact both design and cost plans.

Solutions:

PPM was able to able to implement a reduction in the number of available floor plans across the latter stages, by ensuring a uniformity of quality design and efficiency through their work in the design phase. The large slope across the site was used as an opportunity to increase the number of apartments on the lower side while keeping the residential street face to 3-4 storeys. PPM arranged advance site remediation and clean up works ahead of construction tenders which removed the risk for major cost blow-outs during construction. The construction contract was also required to be financially split into two separate contractual stages to match the client’s pre-sales and financing arrangements.

Results:

PPM was able to implement a reduction in the number of apartment layout floor plans by ensuring a uniformity of quality design and efficiency through their work in the design phase. Additional procedures were established by PPM during the construction phase to efficiently and effectively manage the ‘Purchaser Extras‘, which required approximately 300 variations to be issued under the construction contract.